Construction scheduling software See the schedule against the site, live.
Stop chasing the site for updates. The schedule fills itself in.
Progress tracker
Live- 58%
- Complete
- 5 of 8
- Levels on schedule
- 2 levels
- Behind
- 2
- Issues
- Complete
- In progress
- Issue
- Not started
- Where the schedule says you should be today
Construction scheduling software that knows what's done.
Matrak Progress is construction scheduling software for the half of the job a bar chart cannot see: what is actually finished on each level, set against your schedule.
The schedule updates itself
Trades mark work done on their phone as they finish it, so the schedule shows today's site, not last Friday's meeting.
Every level against the schedule
A live board of levels by trade with the schedule line drawn across it. You see who is behind and who they are holding up.
Construction planning software, already set up
The levels, areas and trades are read from your drawings, and the dates from the schedule you already have. Nothing is rebuilt by hand.
- Programme: UK, Australia and NZ
- Schedule: US and Canada
SRG Global 28 projects to date
What construction schedule software should show
- Planned against actual, by level
- Which trade is holding up the next
- Updates from the phone on site
- Photos behind every update
- Dates from your own schedule
- One live board for everyone
Four steps. Minutes, not months.
- 1Pick the job and its schedule
- 2Bring in levels and zones
- 3Check the trade sequence
- 4Invite the trades and go live
Works well with Progress.
Two modules save 10%. Three save 15%.
Quality
ITPs, inspections and sign-offs, built from your drawings.
- 50 subcontractor companies included
- 10,000 items · 10 AI credits
- Hold points and email alerts
Supply chain
Every product tracked from shop drawing to installed, across every company.
- Manufacturing, Installation, Inventory and Logistics together
- 5 supplier companies included
- 25,000 items · 5 AI credits
- Hold points and email alerts
Claims
Early accessProgress claims checked against what is actually done on site.
- 8 AI credits every month
- Its own dashboard
- Credits share one pool
Compare Matrak Progress
Best value, guaranteed. Got a lower quote? Bring it. We'll beat it by 20%. Send us your quote
Construction scheduling, answered.
Anything not here? Ask Digi and someone from the team will reply by email.
See the schedule against the site, live.
Stop chasing the site for updates. The schedule fills itself in.
