Build my Matrak

Construction change order software Know what a change costs before the argument.

Every revision re-measured the day it lands.

See a sample project

Change order software built on a re-measure.

A change order in the US and Canada is a variation in Australia and the UK, and Matrak Variations is change order software that prices one from the drawings: the new revision is re-measured against the last.

  • The revision measured for you

    The AI measures the whole revised drawing set and compares it with the contract set, so a change on the plan, the elevation and the schedule is one change.

  • Old quantity, new quantity, difference

    Each line that moved is listed with what it was, what it is now and the difference in dollars at your rates.

  • Change order management with proof

    Every change order request goes in with the marked-up drawings that show it, so the conversation is about the price, not whether it changed.

Gammon Construction 202 projects to date

What a change order needs behind it

  • The two revisions compared
  • Quantities added and removed
  • The value of each change
  • Marked-up drawings as evidence
  • A history of who changed what
  • An export in your own format

Four steps. Minutes, not months.

  1. Matrak AI Takeoff start screen: a box to drop PDF drawings, specs and schedules or a whole project folder, with buttons to import from Procore, Autodesk or Aconex1Drop in the drawings
  2. Matrak AI Takeoff results with Digi, the AI estimator, open beside the marked-up drawing and the bill of quantities, ready to make the changes you ask for2Say what you want
  3. Matrak AI Takeoff markups close up: vanities, cabinets, joinery doors and benchtops outlined in four colors on an apartment floor plan, with a legend counting the markups for each3Check it on the drawings
  4. 4Use it

Works well with Variations.

Two modules save 10%. Three save 15%.

AI Takeoff

Turn your drawings into a bill of quantities, with every item marked up.

Pay as you go$89 a credit
  • No subscription
  • $89 a credit, or less on a plan
  • One credit reads one trade

Revisions

New drawing revisions found and compared for you.

$400a month · 5 credits
  • 5 AI credits every month
  • Its own dashboard
  • Credits share one pool

Claims

Early access

Progress claims checked against what is actually done on site.

$400a month · 8 credits
  • 8 AI credits every month
  • Its own dashboard
  • Credits share one pool
FAQ

Change order software, answered.

Anything not here? Ask Digi and someone from the team will reply by email.

Know what a change costs before the argument.

Every revision re-measured the day it lands.

Free for your own company, up to 2,000 items, no card needed · Modules for one project or every project · AI Takeoff from US$89 a trade