Build my Matrak
Matrak Connect

The AI‑orchestrated construction company.

One system runs estimation, manufacturing, supply chain, quality, scheduling and carbon across your whole network. No new app for the team.

  • 7 stages on one record
  • No new app for the team
  • Used in 18 countries
A Matrak floor plan of Level 02 with apartments coloured by facade installation status: not started, in progress, issue and complete
A floor plan in Matrak, every item coloured by its status from site.
Matrak · Supply chain9:12am120 bathroom and kitchen supplies in transitScanned onto the truck by the supplier. ETA Thursday.
Matrak · Quality11:40amLevel 2 waterproofing ITPs signed off24 of 24 checks passed, photos attached.
Digi2:05pmContainer 4 late: Level 8 swapped inCrane crew, installer and client updated.

One record for builders, trades and suppliers, from the factory to handover.

projects run on Matrak
1,300+
of products tracked
$60B+
trades supported
90+
countries
18

One platform your whole supply chain runs on, without learning another app.

  • Multiplex
  • John Holland
  • Gammon
  • Roberts Co
  • SRG Global
  • Built
  • Reece
  • Singyes
Live sampleHorizon Tower

Seven stages on one record

This is construction with Matrak Connect.

Scroll through a sample job. Each team's scans, photos and sign-offs hand the work to the next team, company and country.

1,300+projects run on Matrak
$60B+of products tracked
90+trades supported
01 / 07

Estimation

AI reads your drawings and counts every item across hundreds of pages in minutes.

Who does the workEstimator + Digi
ReplacesTakeoff tools
Review & configure →ListDetail
Plumbing_L1.pdfFullSplit
B01B02B03B04B05RISERCORRIDORB06B07B08B09PLANT
Pipes · 0⤓ Download
IDCodeProductDegSize
CancelConfirm
02 / 07

Manufacturing

Track production from factory floor to dispatch. QR scans, CNC outputs and inspection results, automated.

Who does the workFactory QA · QR scan
ReplacesProduction tracking
Progress tracker▾ Horizon TowerRS
LevelFacade status
Level 02
Level 03
Level 04
Level 05
Level 06
Level 07
Level 08
Level 09
Level 10
Level 11
Level 12
Level 13
✓
Run rates · Facade assemblyProduction throughput vs deadline
Facades ▾Status 1 ▾Last 8 weeks ▾March 28th ▾
W1W2W3W4W5W6W7W85040200
W8: 45 panels/wk
On target for March 28th
Facades assembled (last 8 weeks)
03 / 07

Supply chain

Source-to-site logistics. Shipping updates, in-transit tracking and delivery coordination across 18 countries.

Who does the workFreight forwarder · scan at gate
ReplacesStatus chasing
Search across your project…Window packageRS
Grouped by 1Filter 1Linked records
Group by relationshipStatusDeliveryStillage
▶ Shipping_container_01 12In transit24/09/26Still_01
▶ Still_01 5In transit24/09/26EOD_01+4
EOD_01 1In transit24/09/26Still_01
EOD_01_Frame In transit24/09/26Still_01
EOD_03 In transit24/09/26Still_01
EOD_04 In transit24/09/26CW_L2_001
EOD_05 In transit24/09/26Still_01
▶ Still_02 6In transit24/09/26Container_01
EOD_06 In transit24/09/26Still_02
EOD_07 In transit24/09/26Still_02
▶ Shipping_container_02 8Arrived at yard18/09/26Still_03
▶ Shipping_container_03 15Delivered02/09/26Still_04
▶ Shipping_container_04 10Packed05/10/26Still_05
▶ Shipping_container_05 14Delivered26/08/26Still_06
▶ Shipping_container_06 9Installed09/08/26Still_07
▶ Shipping_container_07 6In transit28/09/26Still_08
▶ Shipping_container_08 11Arrived at yard21/09/26Still_09
04 / 07

Inventory

Warehouse and laydown management. Scan in, allocate to zones, track movements, auto-reorder at thresholds.

Who does the workStoreman · scan in, scan out
ReplacesManual reconciliation
Inventory dashboard▾ Horizon TowerRB
Steel beamsBlueScope Steel
847
of 1,200 (70.6%)
In stock
Facade panelsKingspan AU
312
of 860 (36.3%)
In transit
ReinforcementInfraBuild
64
of 940 (6.8%)
Low stock
Consumed todayAll trades
128
Scanned at 4:12pm
+23% vs avg
MEP fixturesReece Plumbing
905
of 3,368 (26.9%)
Not started
DefectsAll trades
3
Auto-reorder sent
ETA 2 days
✓My workToday's picking lists
PO-4417(12 items)Steel
PO-4418(8 items)MEP
PO-4419(24 items)Facade
PO-4420(6 items)Rebar
PO-4421(15 items)Fire
PO-4422(3 items)Elec
05 / 07

Quality

ITPs built from the contract and the takeoff. The site engineer ticks them off on their phone; sign-off flows to the programme.

Who does the workSite engineer · phone
ReplacesManual ITP checking
06 / 07

Schedule

Monitors your programme for revisions. Creates tasks, assigns subbies, calculates throughput, escalates delays.

Who does the workPM · reads it, never types it
ReplacesManual data entry
Attention required 3
Metro Security SystemsProject setup not started
Updates 0Days since start 442
Performing well 14
RailTech EngineeringOn track
Updates 7,865 ↑Active users 78
ProjectsHealthActivity
AprJunAugOctDecFeb
▸ Mercy Hospital
Mercy Hospital
▾ Silicon Valley DC
Silicon Valley DC
Server racks on site
Server racks on site
Power distribution
Power distribution
▸ Harbour Bridge refurb
Harbour Bridge refurb
▸ Skyline Apartments
Skyline Apartments
⚠ MEP running 6 days behind on Silicon Valley DC · auto-escalated to PM
07 / 07

Carbon

Every product's embodied carbon from EPDs and packing lists. A real-time budget as materials arrive on site.

Who does the workSuppliers' EPDs · automatic
ReplacesSpreadsheet calcs
Carbon emissions reporting▾ New buildMS
Carbon actual vs budgetActual: 0 tCO₂eBudget: 12,400 tCO₂e
Actual to dateRemaining budgetOver budget
CategorySupplierDescriptionWeightEPD reviewStatusGWP kgCO₂e
▸ Superstructure24,5003,412.8
▸ Facade8,6001,890.4
▾ Fitout12,457—
Austral StoneNatural stone benchtops2,100 Analysing
FormCraft JoineryTimber joinery units1,890 Analysing
TileWorks IntlPorcelain floor tiles2,300 Analysing
GreenBuild PlyPlasterboard partitions1,600 Analysing
PaintPro CoatingsInterior paint systems950 Analysing
FloorTech AUCarpet & vinyl flooring1,225 Analysing
CedarLine DoorsInternal door sets780 Analysing
MetalEdge FixturesIronmongery hardware340 Analysing
AcoustiPanel CoAcoustic ceiling tiles1,272 Analysing
▸ External works3,400680.1

Every team stays in step without the chasing.

The work people already do, connected across companies and countries. Next: how one panel's QR code carries it.

How it's coordinated

The work stays. The chasing goes.

Your people already scan, snap and colour in drawings. Matrak connects it, so nobody does it twice or chases it after.

Already happening on your job

  • Scan the panel's QR codeFactory QA · Shenzhen
  • Snap the install photoInstaller · Level 7
  • Colour in the drawingSite engineer · Level 3

Updated automatically

  • Supplierknows it left the factory
  • Freightknows what's on the truck
  • Project managerprogramme updates itself
  • QualityITP ready to sign
  • Clientprogress on the drawing

What disappears

  • Re-keying dockets
  • “Where's my panel?” calls
  • ETA emails to the supplier
  • Updating the programme by hand
  • Chasing photos for the claim
  • Friday status spreadsheets
How the QR codes work

One QR code, factory to sign-off.

Every panel gets a label from the drawings. Each scan along the way updates the drawing, the programme and every company on the job.

Step 1 of 5

Labelled at the factory

Every panel gets its own QR label, made from the drawings. Factory QA scans it as it comes off the line.

Who scans
Factory QA
Updated automatically
BuilderSupplier
The Matrak app's QR code scanner reading a window label, with scanned items set to Complete and In transit
The Matrak scanner reading a panel label. One tap sets the status.
Inside Matrak, on real jobs

Documents into decisions.

Drawings, BoQs and packing lists already sit in your shared drive. Matrak reads them and runs the job from them.

Matrak's Review and configure screen reading a supplier packing list spreadsheet into items with ID, status, height and width
A supplier packing list read into Matrak, row by row.

From messy to manageable

Matrak reads, cleans and maps packing lists, dockets and supplier spreadsheets to your project, so nobody re-keys a row.

A Matrak construction schedule: each task in progress, delayed or not started, with start and end dates
The programme, live: what's in progress and what's late.

Progress without the Friday spreadsheet

Every level's progress from what crews already scan and sign. A delay shows the day it happens.

Every line's embodied carbon, checked against its EPD.

Carbon, already done

Every product's embodied carbon from supplier EPDs and packing lists, reviewed line by line.

Matrak notifications panel: status updated, 120 bathroom and kitchen supplies now in transit, a delivery now in transit
Notifications as items move through the supply chain.

Everyone told, nobody chased

Status changes reach the people who need them the moment a scan lands, so nobody rings to ask where a delivery is.

Your team keeps working where it works. Matrak does the typing.

Digi, on every project

Digi watches the whole job.

Digi reads every scan, photo, delivery and date across your projects. When something slips, it works out who's affected and lines up the fix.

  • Factory output
  • Containers at sea
  • Gate deliveries
  • Stock on site
  • ITPs due
  • Carbon budget

Watching your projects…

When something slips

  1. Container 4 held at Yantian port · 4 days lateFreight forwarder's update
  2. Checks the knock-on: Level 9 facade, Thursday's crane bookingDigi
  3. Finds a fix: Level 8 panels are already on site. Swap the sequence.Digi
  4. PM approves in one tapAlex, project manager
  5. Installer, crane crew, supplier and client updatedAutomatic

Nobody called anybody.

Find your fit

Where do you fit in the job?

Pick your role. See the stages you touch, and what Matrak takes off each one.

I'm a…

You touch 5 of 7 stages. Matrak connects all seven, so nothing is typed twice.

  1. EstimateEstimation
  2. MakeManufacturing
  3. SupplySupply chain: you touch this stage
  4. StockInventory: you touch this stage
  5. QualityQuality: you touch this stage
  6. ScheduleSchedule: you touch this stage
  7. CarbonCarbon: you touch this stage

Recommended for you

  • QualityITPs built from your drawings. Trades sign off on site, with photos.
  • ProgressProgress colours in on the drawing. Nobody asks “where are we at?”
  • LogisticsEvery delivery booked to a gate and a crane. Nothing to chase.
  • CarbonScope 3 on every line, ready before the client asks.
20 hrsa week of ITP admin goneHandover without the 3am panic.
How you start

Four steps from here to live.

Pick what you need, see your price, bring your team in and go live when you're ready.

2 minutes

Build your Matrak

Pick the modules you need and the systems you already use, like Procore, Aconex or Autodesk.

+Quality+Logistics+Procore
Free to start

See your price

Say how big the job is and who works on it, and your price moves as you answer. Your own company is free.

Unlimited users

Bring your team in

Invite your own people, then your trades and suppliers onto the same project.

When you're ready

Go live

Share the link for sign-off, then switch it on by card or invoice.

ActivateCard in the app, or invoice
Build my MatrakYour own company is free, no card needed. Prefer a walkthrough? Book a demo.
Connect my systems

Connect once. Everything flows.

Tap the systems you already use and they're added to your Matrak. Procore, Aconex, Autodesk, shared drives and email sync in.

FAQ

Straight answers.

Anything not here? Ask Digi and someone from the team will reply by email.

Matrak · Quality11:40amLevel 2 waterproofing ITPs signed off24 of 24 checks passed, photos attached.

See it on your own project.

Start free with your own company, up to 2,000 items, or build your Matrak: pick your modules and see your price. Prefer a walkthrough? Book a demo.

Free for your own company, up to 2,000 items, no card needed · Modules for one project or every project · AI Takeoff from A$89 a trade