Concrete estimating software with AI takeoff Slabs, footings and cubic metres, worked out.
Areas, runs and concrete volumes off the structural set in about 30 minutes. Can save over $2,000 of estimating labour on a project.
Concrete estimating software that works out the cube.
Matrak AI Takeoff is concrete estimating software: the AI outlines slabs and footings on the structural drawings, then derives cubic metres from the thickness printed on them.
Square metres and cubic metres
A slab is measured as an area, then given its volume from the stated thickness. Footings and beams carry length and volume from their section size.
Columns, walls and stairs
Columns and stair flights are counted. Core walls, blade walls and retaining walls are measured by face area, each with its volume.
Where concrete takeoffs go wrong
A thickness gets assumed. Matrak derives a volume only where the drawing states the depth, and leaves it blank where it does not.
Reece Plumbing 46 projects to date
Concrete takeoff software, pour by pour
Read from the footing plan, the slab and framing plans for each level, the structural sections and the footing and column schedules.
| Item | Measured as | Quantity |
|---|---|---|
| Strip footing SF1, 600 x 300 | Length, volume derived | 186 m / 33 m³ |
| Slab on ground, 150 mm | Area, volume derived | 1,240 m² / 186 m³ |
| Suspended slab, 250 mm | Area, volume derived | 5,600 m² / 1,400 m³ |
| Column C1, 600 x 600 | Count | 84 no. |
| Core wall, 250 mm | Face area | 920 m² |
| Slab edge form | Lineal run | 640 m |
| Saw cut control joint | Lineal run | 310 m |
| Pile cap PC1 | Count, volume derived | 18 no. / 54 m³ |
What a concrete takeoff covers
- Footings, piers and pile caps
- Slabs with their volume
- Columns, walls and cores
- Stairs and landings
- Slab edges and soffits
- Joints, kerbs and upstands
Four steps. Minutes, not months.
1Drop in the structural set
2Say if formwork is yours
3Check each pour outlined- 4Order the cube
Works well with AI Takeoff.
Two modules save 10%. Three save 15%.
Carbon
Early accessScope 3 embodied carbon on every line, every revision.
- No subscription
- $89 a credit, or less on a plan
- One credit reads one trade
Quality
ITPs, inspections and sign-offs, built from your drawings.
- 50 subcontractor companies included
- 10,000 items · 10 AI credits
- Hold points and email alerts
Progress
Progress that updates itself from the site.
- Everyone in your own company
- 10,000 items · 5 AI credits
- Its own home page and reports
Compare Matrak AI Takeoff
Best value, guaranteed. Got a lower quote? Bring it. We'll beat it by 20%. Send us your quote
Concrete takeoff, answered.
Anything not here? Ask Digi and someone from the team will reply by email.
Slabs, footings and cubic metres, worked out.
Areas, runs and concrete volumes off the structural set in about 30 minutes. Can save over $2,000 of estimating labour on a project.