Build my Matrak

Steel fabrication estimating software with AI takeoff Every member listed, with its tonnage.

Beams, columns and plates scheduled in about 30 minutes. Can save over $2,000 of estimating labour on a project.

See a sample project

Fabrication estimating software that reads the steel schedule.

Matrak AI Takeoff is fabrication estimating software for structural steel: the AI lists every member by section size from the framing plans and the member schedule, with lengths and tonnes.

  • Members by section size

    Universal beams and columns, PFCs, SHS, RHS, CHS and angles are listed by mark and section, with the length measured from the framing plan.

  • Tonnes from metres

    Each section's unit weight turns measured length into tonnage, so the bill carries both figures and surface treatment can be priced by the tonne.

  • Where steel takeoffs go wrong

    Plates, cleats and base plates become a percentage. Matrak counts the connections the drawings detail and keeps purlins, girts and bracing as their own lines.

Reece Plumbing 46 projects to date

Structural steel takeoff software, member by member

Read from the steel framing plans, the member schedule, the elevations and the connection details.

ItemMeasured asQuantity
310UB40 beam, mark B1Length, tonnes derived426 m / 17.2 t
250UC73 column, mark C2Count and length38 no. / 152 m
150PFCLineal run284 m
89 x 89 x 5 SHS bracingLineal run196 m
Z200 purlinLineal run1,840 m
Base plate with holding-down boltsCount38 no.
Hot dip galvanisingWeight24.6 t
Flat plate stiffener, 10 mmCount212 no.

What a steel takeoff covers

  • Beams and columns by mark
  • Hollow sections and angles
  • Purlins, girts and bridging
  • Base plates and connections
  • Bracing in lineal metres
  • Surface treatment by the tonne

Four steps. Minutes, not months.

  1. Matrak AI Takeoff start screen: a box to drop PDF drawings, specs and schedules or a whole project folder, with buttons to import from Procore, Autodesk or Aconex1Drop in the steel drawings
  2. Matrak AI Takeoff results with Digi, the AI estimator, open beside the marked-up drawing and the bill of quantities, ready to make the changes you ask for2Say what metalwork is in
  3. Matrak AI Takeoff markups close up: vanities, cabinets, joinery doors and benchtops outlined in four colours on an apartment floor plan, with a legend counting the markups for each3Check each member listed
  4. 4Send it to the workshop

Works well with AI Takeoff.

Two modules save 10%. Three save 15%.

Manufacturing

Production tracked factory floor to dispatch, by QR.

$21.6Ka project, a year
  • Everyone in your own company
  • 10,000 items · 3 AI credits
  • Its own home page and reports

Carbon

Early access

Scope 3 embodied carbon on every line, every revision.

Pay as you go$89 a credit
  • No subscription
  • $89 a credit, or less on a plan
  • One credit reads one trade

Design management

Early access

Drawing approvals tracked, so every level is signed off in time.

$350a month · 4 credits
  • 4 AI credits every month
  • Its own dashboard
  • Credits share one pool
FAQ

Steel takeoff, answered.

Anything not here? Ask Digi and someone from the team will reply by email.

Every member listed, with its tonnage.

Beams, columns and plates scheduled in about 30 minutes. Can save over $2,000 of estimating labour on a project.

Free for your own company, up to 2,000 items, no card needed · Modules for one project or every project · AI Takeoff from A$89 a trade