Construction quality management plan

A construction quality management plan at work: a Matrak floor plan of Level 02 with every apartment coloured by its status, from not started to complete

A construction quality management plan (QMP) is the document that says how a project will be built right the first time: who is responsible for quality, which standards apply, what is inspected and tested, who signs, and what happens when work fails a check. It is also called a construction quality plan or a project quality plan.

The head contractor writes one for the project and each subcontractor writes a shorter one for their trade. In Australia it usually sits under an ISO 9001 quality system and is asked for by the contract. In the United States the same document is often called a construction quality control plan.

What is in a construction quality management plan?

Nine sections cover it. Keep each one to half a page.

SectionWhat it saysExample
1. Scope and objectivesWhat is being built and the targets the job is measured onEvery hold point released before cover-up. No open defects at handover.
2. RolesWho owns quality on site, who inspects and who can stop workQuality manager, site manager, each subcontractor's supervisor
3. Standards and documentsWhat the work is checked againstCurrent drawings, the specification, the building code and the standards it calls up
4. Subcontractors and suppliersHow trades and materials are approved before they startPrequalification, approved samples, shop drawings, material certificates
5. Inspections and testsThe inspection and test plan (ITP) for each tradeOne ITP each for concrete, waterproofing, fire stopping and facade
6. Hold and witness pointsWhere work stops for a sign-off and who gives itReinforcement before a pour, membrane before tiling
7. Non-conformanceWhat happens when work failsRaised the same day, fixed, re-inspected, then closed
8. Records and handoverWhat evidence is kept and whereSigned ITPs, photos, test reports, certificates
9. Audit and reviewHow you check the plan is followedA site audit each month, a review at each stage
Matrak construction quality management software: a quality report listing the ITPs for each trade with checks signed off and hold points waiting, beside the phone inspection checklist

Quality assurance in construction: set it up right

Quality assurance (QA) is the half of the plan that prevents defects. Quality assurance in building construction is mostly decided before a trade starts:

  • The right people. Trades are prequalified, and licensed where the state requires it.
  • The right materials. Samples, data sheets and shop drawings are approved before anything is ordered.
  • The right method. An approved ITP for each trade, with a pass mark on every line.
  • A first-off. The first room, panel or pour is inspected by everyone and becomes the standard for the rest.

Quality control in construction: check it is right

Quality control (QC) is the checking: inspections, tests and sign-offs against the ITP while the work is done. Quality control in building construction is done lot by lot, so each room, pour or level has its own record. Use this construction quality control checklist before anything is covered up:

  1. The trade is working from the current drawing revision.
  2. The material on site is the approved product.
  3. The work of the trade before has been accepted.
  4. Each check is made against the pass mark in the ITP, not by eye.
  5. A photo is taken at the work, with its location.
  6. The hold point is released in writing before the next trade starts.

Write that list out trade by trade as a QA checklist and you have the start of an ITP. Quality control in construction projects fails when the checks are real but the records are not. People shorten the two halves to QA/QC in construction: quality assurance vs quality control explains the split.

The inspection half of the plan, done for you. Matrak Quality builds the ITPs from your drawings and files every sign-off against its room.

How to monitor construction site quality

A plan in a folder changes nothing. Monitoring is five habits:

  • Walk the work. Inspect at the work face, on the day, against the ITP.
  • Count by lot. Track rooms, pours and panels inspected against the total, not a percentage someone guessed.
  • Watch three numbers each week. Inspections due against done, hold points waiting, and open non-conformances with their age.
  • Close the loop. A failed check gets an owner, a date and a re-inspection. A bigger failure gets a non-conformance report.
  • Look for repeats. The same failure three times is a method problem. Fix the method, not the worker.

That is how to ensure construction quality without adding a meeting: the numbers come from inspections you are already doing.

Example: fire stopping in the quality plan

One trade followed through the plan. Your own entries come from your contract and specification.

Plan sectionEntry for fire stopping to service penetrations
RolesThe fire stopping supervisor inspects every penetration. The quality manager releases the hold point.
StandardsThe specification, the tested system's data sheet and AS 4072.1
Before work startsInstaller approved by the system's manufacturer, products approved, a sample penetration accepted on Level 1
InspectionITP-FS-01: every penetration labelled, photographed and checked
Hold pointThe ceiling on each level stays open until the release is signed
If it failsNon-conformance raised, penetration re-sealed, re-inspected with a new photo
RecordA penetration register with one photo for each, in the handover pack

Free quality management plan template

Take our quality management plan template for Excel: the nine sections with prompts to fill in, a responsibilities table, an ITP register and a non-conformance log. Each sheet prints on A4. No sign-up. The ITP register doubles as a construction quality control checklist template: one line for each trade's ITP, with its hold points.

No.SectionWhat to writeYour project
1Scope and quality objectivesWhat is being built, and the targets the job will be measured on
2Roles and responsibilitiesWho owns quality on site, who inspects, and who can stop work
3Standards and documentsThe drawings, specification, codes and standards the work is checked against

Common mistakes in quality plans

  • Copied from the last job. A plan that names the wrong engineer and the wrong trades is ignored from day one.
  • Nobody can stop work. If the plan does not say who may stop a pour, nobody will.
  • Inspect, but against what? 'Check waterproofing' is not a check. Name the drawing, the clause or the tolerance.
  • Subcontractor plans never read. Their ITP is where the real checks are. Review it before they start.
  • Records by trade, not by place. At handover the question is 'show me bathroom 305', not 'show me waterproofing'.
  • Never updated. When the design changes, the ITPs and the plan change with it.
A Matrak ITP register for the facade panels on Level 02: each panel's status, with every inspection check marked pass, fail or N/A

Digital quality management in construction, with Matrak

Matrak QualityPlan on paper
A pass mark and a signer on every checkYesYes
ITPs written for each trade and room without typingYesNo
Checks answered on the phone with a photoYesNo
Hold points that make work wait for the right sign-offYesNo
Every room coloured by its status on the drawingYesNo
Handover pack filed as the work is doneYesNo

How Matrak does it. Matrak Quality builds your plan's ITPs from your drawings, for each trade and room. Trades answer each check on the phone with a photo, hold points wait for the right sign-off, and the drawing colours every room by its status. $18,000 for one project for a year, 50 subcontractor companies included (A$, plus GST).

Why the plan gets followed. The drawings come straight from Procore, Aconex and Autodesk, a new revision is picked up when it lands, and a full audit history shows who signed what, and when.

Comparing systems? See how the quality systems compare. Next: what an ITP is and the site inspection checklist.

Frequently asked questions

What is a construction quality management plan?

It is the project document that sets out how quality will be managed: the people responsible, the standards the work is checked against, the inspections and tests for each trade, the hold points, and how failures are fixed and recorded.

What is construction quality management?

Construction quality management is how a builder makes sure the work meets the drawings, the specification and the standards. Quality management in construction projects has three parts: planning (the quality plan and the ITPs), checking (inspections and tests) and fixing (non-conformances, and lessons for the next job).

Who writes the quality management plan?

The head contractor's quality or project manager writes the project plan, usually before work starts on site. Each subcontractor then writes a plan and ITPs for their own trade, which the head contractor reviews and approves.

What is the difference between a quality management plan and an ITP?

The quality management plan covers the whole project: roles, standards, approvals, records. An ITP covers one trade: every inspection and test for that work, its pass mark and who signs. The plan lists which ITPs the job needs.

Is a quality management plan required in Australia?

It is usually a contract requirement, not something an Act asks for by name. Most commercial and government contracts ask for a project quality plan that follows ISO 9001. Check your contract and specification.

Put this to work on your job.

Pick the modules you need, see your price and share it with whoever signs it off. No call needed.

Read enough? See it on your job.

Start free with your own company, up to 2,000 items, or build your Matrak: pick your modules and see your price. Prefer a walkthrough? Book a demo.

Free for your own company, up to 2,000 items, no card needed · Modules for one project or every project · AI Takeoff from A$89 a trade