Construction site inspection checklist

A site inspection checklist in Matrak: the facade panels on Level 02, each with its status and every check marked pass, fail or N/A

A site inspection checklist is a list of the things to look at on a walk of the job, each answered pass, fail or not applicable, with a note and a photo where something is wrong. A construction site inspection checklist turns 'have a look around' into the same check every time, whoever does the walk.

This one covers the work itself: is it built to the drawings, protected, and ready for the next trade. Below are the lines for a weekly walk, a waterproofing inspection checklist filled in, and a template to download.

What goes on a construction site inspection checklist?

Every line needs the same five things:

  • One thing to look at. Written so the answer is yes or no.
  • The standard. A drawing, a specification clause or a tolerance. 'Looks fine' is not a standard.
  • A result. Pass, fail or N/A. Nothing in between.
  • Evidence. A photo taken at the work, with its location.
  • An action. For every fail: who fixes it, and by when.
A Matrak tiling report by apartment: each apartment's status with its inspection results marked pass, fail or N/A, and start and due dates

Site inspection checklist for the weekly walk

Ten lines that suit most building sites. Add your own for the trades on the job.

AreaWhat to checkPass looks like
Drawings on siteTrades are working from the current revisionThe revision at the work matches the register
Set-outGrids, levels and openings match the drawingsChecked dimensions are within tolerance
Work in progressEach trade's work matches the approved sampleNo visible departure from the sample
Before cover-upWork about to be covered is inspected and photographedHold points are released in writing
Penetrations and servicesSealed and tested before the linings closeTest records are on file
MaterialsThe approved product, stored dry and off the groundDockets match the approved product
ProtectionFinished work is protected from the trades that followFloors, glass and joinery are covered
HousekeepingThe area is clean and clear for the next tradeNo waste or stored material in the way
Open itemsFails from the last walk are closed or have a dateNothing older than the agreed time
RecordsThis week's ITPs and checklists are signedNo unsigned checks for finished work

When should you inspect?

  • Before a trade starts. Is the area ready, and has the work before been accepted?
  • At the first-off. The first room or panel sets the standard for the rest.
  • Before cover-up. Once the ceiling closes or the tiles go down, you are checking photos, not work.
  • Every week. The walk above, same route, same day.

The checklist for every room, written for you. Matrak Quality builds the checks from your drawings and puts them on the trade's phone.

Example: a waterproofing inspection checklist

One bathroom, filled in. Results are words, so the sheet reads the same in black and white.

No.CheckResultNote
1Substrate clean, dry and primedPassPhoto 1
2Floor falls to the waste as drawnPassChecked with a level
3Bond breaker at every wall and floor junctionFailMissing behind the door frame. Fixed the same day, photo 3
4Membrane coats and coverage to the data sheetPassTwo coats, batch number recorded
5Upturns and shower extents as drawnPass
6Flood test held for the specified period, no leaks belowPassPhoto 5

A fail that is found, fixed and recorded is the checklist working. For hold points and who signs each line, see ITP in construction.

Free construction checklist template

Take our inspection checklist template for Excel: the weekly walk on one sheet with a pass, fail or N/A drop-down, and the waterproofing example on a second. It prints on A4. No sign-up.

No.AreaWhat to checkResultNote or action
1Drawings on siteTrades are working from the current revision
2Set-outGrids, levels and openings match the drawings
3Work in progressEach trade's work matches the approved sample or first-off

Common mistakes with inspection checklists

  • Ticked from the site office. A checklist filled in from memory is a guess with a signature.
  • Lines nobody can fail. 'Workmanship satisfactory' always passes. Name what you measure.
  • A fail with no owner. Every fail needs a name and a date, or it is found again next week.
  • One sheet for the whole floor. Inspect by room, so you can show which room was checked.
  • No photos. In a dispute, a tick is your word. A photo with a location is evidence.
The Matrak BIM viewer: a 3D building model coloured by status, with one facade panel's inspection checks marked pass

A phone checklist, built from your drawings

Matrak QualityPaper checklist
Pass, fail or N/A on every lineYesYes
A checklist for each trade and room, made from your drawingsYesNo
Answered on the phone at the workYesNo
A photo kept on every checkYesNo
A failed check shows on the drawing straight awayYesNo
Every check filed against its room for handoverYesNo

How Matrak does it. Matrak Quality turns your drawings into inspection checklists for each trade and each room. The trade answers each check on the phone with a photo, a failed check marks the room on the drawing, and hold points wait for the right sign-off. $18,000 for one project for a year, 50 subcontractor companies included (A$, plus GST).

Why nobody retypes a checklist. Matrak fetches the drawings from Procore, Aconex and Autodesk and picks up each new revision, and every answer is kept in a full audit history with who gave it and when.

Weighing up inspection systems? See how the quality systems compare. Related: the construction quality management plan and the ITP template.

Frequently asked questions

What is a site inspection checklist?

It is a list of items to check on a walk of a construction site, each marked pass, fail or not applicable, with notes, photos and an action for anything that fails. It makes every inspection cover the same ground.

How often should a construction site be inspected?

Walk the whole site at least once a week, and inspect each trade's work before it starts, at the first-off and before it is covered up. Your contract or quality plan may set a tighter rhythm.

Who should carry out a site inspection?

The site manager or supervisor does the weekly walk. Each subcontractor's supervisor inspects their own work first, and the engineer, certifier or client's representative inspects the points that are theirs.

What is the difference between a site inspection checklist and an ITP?

A checklist is a list of things to look at on a walk. An ITP is the plan for one trade: every inspection and test in build order, the pass mark, who signs and where work must stop. A checklist filled in for one room is often the record an ITP asks for.

What should I do when an item fails?

Record it with a photo, name who will fix it and by when, and re-inspect before the work is covered. If it is covered up or built to the wrong drawing, raise a non-conformance report.

Put this to work on your job.

Pick the modules you need, see your price and share it with whoever signs it off. No call needed.

Read enough? See it on your job.

Start free with your own company, up to 2,000 items, or build your Matrak: pick your modules and see your price. Prefer a walkthrough? Book a demo.

Free for your own company, up to 2,000 items, no card needed · Modules for one project or every project · AI Takeoff from A$89 a trade